Augean Enhances Power Quality and Cuts Energy Costs with Voltage Reduction

Get a savings estimate
Mitchells & Butlers
Brother
GCP
Monaghan
Kinnerton
Hydes Brewery
Macclesfield FC
Hilton Hotels & Resorts
Global Brands
PizzaExpress
Florette
Powerdown220 partner

Problem

Augean, a leading waste management company, had identified a need to improve their site’s overall power quality, as well as reducing energy costs. Usually, a site may see voltages fluctuating between 236v – 244v, but Augean were experiencing swings between 220v – 253v, which is the maximum amount allowed in the UK. This meant that a change in the supply affected them greatly, mainly in the form of surges which damaged the electrical equipment and shortened its lifespan.

Solution

By installing a voltage optimiser, Augean took control of their electrical supply for energy efficiency gains. As well as reducing their incoming power by eight per cent, which restricted their maximum voltage to 232v, they also set the auto inhibit at 220v to prevent a drop in supply. From reducing the impact of power surges, Augean were able to increase the lifespan of their equipment by 46 per cent, while making an energy saving of 8.45 per cent on their total annual electricity bill. They also removed over 20 tonnes of carbon emissions from the environment each year.

Testimonials

If any company uses a large amount of electricity and wants to reduce costs and support the environment, I would recommend a Voltage Optimiser with Powerdown220.

Paul Turnbull Managing Director · Harrison Packaging

We sincerely appreciate the responsiveness and the way that you conduct business. We have recommended your company to others because of our satisfaction with your service.

Graham McKinley Site Facilities and Service Engineer · Kinnerton Confectionery

We are delighted to welcome Powerdown220 into our commercial family, with a deal that will span for the next three years. We have already started to see vast amounts of savings in our energy bills since the installation and look forward to this continuing.

Head of Commercial and Sponsorships Macclesfield FC

I didn’t realise beforehand that this would be the biggest project of its kind in the UK, but that fact puts it all into perspective. Powerdown had a really robust plan to deliver over 1100 Mitchell & Butlers sites across the country.

Dale Fenton Energy Manager · Mitchell & Butlers

When I looked into the technology, it was a no-brainer. It offered a quick return on investment with continued savings going forward and completely fitted with our environmental strategy.

Head of Facilities Domino Printing