If any company uses a large amount of electricity and wants to reduce costs and support the environment, I would recommend a Voltage Optimiser with Powerdown220.
Voltage Optimisation (VO) has been used extensively in the plastics and injection moulding industry for many years to reduce energy costs on-site. Because of high energy consumption requirements and rising energy costs, VO is quickly becoming one of the most popular energy savings technologies, with many plastic and injection moulding companies approaching Powerdown220 to reduce energy costs and carbon emissions.
Whilst there is a difference in savings across all electrical equipment in the plastics industry based on its voltage dependency, VO tends to make consistently high savings on equipment such as motors found in all types of air compressors, extraction and chopper fans, vacuum pumps industrial automated assembly lines, as well as material handling and packaging conveyors.
Whilst VO does not make a saving on LED lighting for example, it does help to protect the equipment and make it last longer, with an increase in the equipment lifespan of up to 46%, as stated by (UK wiring regs BS7671).
Calculating savings for VO is a fairly straightforward process, our technical team completes a full on-site technical survey, to confirm the exact savings made at any particular site.
Once we complete a technical survey we can offer a full savings guarantee, meaning if we don’t deliver the savings promised, we will remove the equipment and offer a full refund.
We have recently completed an installation at Sone Products, Based in Stanley. Sone Products manufactures plastic liquid packaging products for the cosmetic and medical sectors. After undertaking a site survey, we established they would need a 1000i Voltage Optimiser.
Creative Composites, based in Lisburn, Nothern Ireland approached Powerdown to find ways of reducing their energy bills and carbon footprint, by improving energy efficiency.
Creative Composites are leading injection moulding experts operating the largest presses in the UK, manufacturing products for the automotive, transport and off-highway sectors.
They are committed to operating responsibly and sustainably to help protect the environment.
They committed further to the environment by optimising their voltage on-site, and as a result reduced their energy consumption by 7.22% and reduced their annual carbon emissions by 73,700 KG.
If any company uses a large amount of electricity and wants to reduce costs and support the environment, I would recommend a Voltage Optimiser with Powerdown220.
We sincerely appreciate the responsiveness and the way that you conduct business. We have recommended your company to others because of our satisfaction with your service.
We are delighted to welcome Powerdown220 into our commercial family, with a deal that will span for the next three years. We have already started to see vast amounts of savings in our energy bills since the installation and look forward to this continuing.
I didn’t realise beforehand that this would be the biggest project of its kind in the UK, but that fact puts it all into perspective. Powerdown had a really robust plan to deliver over 1100 Mitchell & Butlers sites across the country.
When I looked into the technology, it was a no-brainer. It offered a quick return on investment with continued savings going forward and completely fitted with our environmental strategy.