Eliminating Electricity Overspend in the Plastic Industry with Voltage Optimisation

Get a savings estimate

Mitchells & Butlers Achieve UK’s Largest Voltage Optimisation Rollout

Get a savings estimate

Voltage Optimisation (VO) has been used extensively in the plastics and injection moulding industry for many years to reduce energy costs on-site. Because of high energy consumption requirements and rising energy costs, VO is quickly becoming one of the most popular energy savings technologies, with many plastic and injection moulding companies approaching Powerdown220 to reduce energy costs and carbon emissions.

Whilst there is a difference in savings across all electrical equipment in the plastics industry based on its voltage dependency, VO tends to make consistently high savings on equipment such as motors found in all types of air compressors, extraction and chopper fans, vacuum pumps industrial automated assembly lines, as well as material handling and packaging conveyors.

Whilst VO does not make a saving on LED lighting for example, it does help to protect the equipment and make it last longer, with an increase in the equipment lifespan of up to 46%, as stated by (UK wiring regs BS7671).

Calculating savings for VO is a fairly straightforward process, our technical team completes a full on-site technical survey, to confirm the exact savings made at any particular site.

Once we complete a technical survey we can offer a full savings guarantee, meaning if we don’t deliver the savings promised, we will remove the equipment and offer a full refund.

Voltage Optimisation Specialists Reduces Annual Energy Costs at Brother Industries by £41k

Get a savings estimate
  • We partnered with Brother Industries, based in Wrexham have a dedicated injection moulding division that delivers precision injection moulding services to a range of blue chip clients.
  • By installing a voltage optimiser, Brother not only boosted their bottom line but also reduced their annual carbon emissions by a remarkable 25 tonnes.
  • That’s equivalent to planting 775 trees.
  • Elsewhere, the company also made annual savings worth £41K and saw a return on investment within 18 months.
£397,028 Annual Spend
£41,468 Annual Savings
10.44% Percentage Savings
25,765 KG Annual Carbon Reduction
18 Months Payback

Kinnerton Confectionery Cuts Costs with Voltage Optimisation

Get a savings estimate

Guaranteed Energy Savings Against Rising Energy Prices

  • Fischbach, an injection moulding market leader in the supply of cartridges, nozzles and plunger systems for the sealants and adhesives industry, faced a huge increase in their kwh rate from their energy supplier, with their annual costs increasing owing to the energy crisis. They turned to voltage optimisation to protect their business from spiraling energy cost rises and benefit from its fast payback and stable long-term results.
  • Following a full technical survey, we pledged that the Voltage Optimiser would deliver a minimum saving of 7.22%, which was further underpinned by the Powerdown220 Savings Guarantee. With these figures in mind, they were able to budget and plan, helping to protect against their increase in energy costs.

A Stable Power Supply and a 163-tonne Reduction in Carbon

  • In addition, Fischbach is also benefiting from a more stable power supply on-site, with their equipment only drawing the energy that it needs to run at its optimal level, rather than having to work harder due to excess energy from the grid.
  • As a result, the voltage optimiser will help increase the lifespan of the equipment and save on future expenditures by reducing ongoing maintenance and replacement costs across the site. The voltage optimiser has also reduced Fischbach’s carbon footprint by 163 tonnes of harmful carbon emissions a year
£901,719 Annual Spend
£63,181 Project Cost
£65,096 Annual Savings
163,210 KG Annual Carbon Reduction
7.22% Percentage Savingss
11.6 Months Payback

Sone Products Reduce Energy Consumption by 10.44%

We have recently completed an installation at Sone Products, Based in Stanley. Sone Products manufactures plastic liquid packaging products for the cosmetic and medical sectors. After undertaking a site survey, we established they would need a 1000i Voltage Optimiser.

£263,485 Annual Spend
£43,253 Project Cost
£27,520 Annual Savings
65,426 KG Annual Carbon Reduction
10.44% Percentage Savingss
18.9 Months Payback

Creative Composites Embrace Voltage Optimisation

Creative Composites, based in Lisburn, Nothern Ireland approached Powerdown to find ways of reducing their energy bills and carbon footprint, by improving energy efficiency.

Creative Composites are leading injection moulding experts operating the largest presses in the UK, manufacturing products for the automotive, transport and off-highway sectors.

They are committed to operating responsibly and sustainably to help protect the environment.

They committed further to the environment by optimising their voltage on-site, and as a result reduced their energy consumption by 7.22% and reduced their annual carbon emissions by 73,700 KG.

£341,211 Annual Spend
£39,487 Project Cost
£41,888 Annual Savings
48,888 KG Annual Carbon Reduction
12.27% Percentage Savingss
12 Months Payback

Manchester Based Nufox Rubber Reduce Energy Costs with Voltage Stabilisation

Get a savings estimate
£120,054 Annual Spend
£16,430 Project Cost
£7,007 Annual Savings
5,357 KG Annual Carbon Reduction
5.84% Percentage Savingss
28.1 Months Payback

Testimonials

If any company uses a large amount of electricity and wants to reduce costs and support the environment, I would recommend a Voltage Optimiser with Powerdown220.

Paul Turnbull Managing Director · Harrison Packaging

We sincerely appreciate the responsiveness and the way that you conduct business. We have recommended your company to others because of our satisfaction with your service.

Graham McKinley Site Facilities and Service Engineer · Kinnerton Confectionery

We are delighted to welcome Powerdown220 into our commercial family, with a deal that will span for the next three years. We have already started to see vast amounts of savings in our energy bills since the installation and look forward to this continuing.

Head of Commercial and Sponsorships Macclesfield FC

I didn’t realise beforehand that this would be the biggest project of its kind in the UK, but that fact puts it all into perspective. Powerdown had a really robust plan to deliver over 1100 Mitchell & Butlers sites across the country.

Dale Fenton Energy Manager · Mitchell & Butlers

When I looked into the technology, it was a no-brainer. It offered a quick return on investment with continued savings going forward and completely fitted with our environmental strategy.

Head of Facilities Domino Printing